Why raw scores mislead
A critical score on an isolated test bench may matter less than a medium one on a reachable safety-related controller. Prioritisation in OT starts with exposure and consequence: what the asset does, what can reach it and what happens to the process if it fails.
The OT patch path
Patches are applied only after the equipment vendor has approved them for your version, tested on representative systems, and scheduled into a planned window with a rollback plan.
Where a patch cannot be applied, on a legacy HMI or a controller that cannot restart until the next turnaround, the gap is handled as a formal, time-bound deviation with compensating controls such as isolation, allow-listing and closer monitoring. It expires on schedule and is reviewed, never quietly renewed.
- 01Prioritise by exposure and process consequence.
- 02Vendor approval, testing, window and rollback before any patch.
- 03Unpatchable means compensated and time-bound, not ignored.